Navies plan in hulls and deliver in decades. A frigate ordered today reaches the fleet around the time the ship it replaces should already have gone, and the gap between a published force-structure target and the yards available to build it is the recurring story in almost every navy.
This section covers surface combatants, submarines, amphibious and support ships, and the shipbuilding and repair capacity behind them. Vertical launch cell counts, radar and combat system fits, propulsion choices, crewing levels. Maintenance backlogs and the availability they produce.
Delivery dates are reported as the yard states them, and again when they move. Where a design loses capability between contract and commissioning, usually launch cells or a hull-mounted sonar, that is worth saying plainly.
The Swedish Defence Materiel Administration (FMV) has awarded Saab a contract for 22 additional CB90 fast assault boats, placing a fresh £70 million order that lifts Sweden's amphibious capacity at a moment when Baltic security demands rapid response craft.
The Royal Australian Navy has added a new hull to its order of battle. On 28 June the service commissioned HMAS Arafura, first of the Arafura-class offshore patrol vessels, during a ceremony at Fleet Base West near Fremantle. Defense officials confirm the
General Dynamics Mission Systems, a key arm of General Dynamics Corp., landed an $882 million Navy deal to build large vertical sonar arrays for next-wave submarines. The award cements plans to widen undersea reach and signals faith in U.S. industry. Navy buyers
The Republic of Singapore Navy rolled out RSS Indomitable, its fifth Independence-class Littoral Mission Vessel (LMV). The slip at Benoi Yard filled fast with brass, engineers, and overseas guests keen to see what fresh hull adds to regional sea security.
Australia’s $45 billion Hunter-class frigate program faces fresh scrutiny after Senator David Shoebridge asked the National Anti-Corruption Commission (NACC) to examine how the Royal Australian Navy chose the British Type 26 design despite warnings it carried “extreme risk.” The referral follows a
Trieste — The Italian Navy’s new landing helicopter dock Trieste is finishing fit-out work in its namesake port. Crews install last cables, test pumps, and seal bulkhead gaps that slipped first reviews. Yard teams say hand-over stays on the late-2024 window, with