Naval Systems - Page 2

Navies plan in hulls and deliver in decades. A frigate ordered today reaches the fleet around the time the ship it replaces should already have gone, and the gap between a published force-structure target and the yards available to build it is the recurring story in almost every navy.

This section covers surface combatants, submarines, amphibious and support ships, and the shipbuilding and repair capacity behind them. Vertical launch cell counts, radar and combat system fits, propulsion choices, crewing levels. Maintenance backlogs and the availability they produce.

Delivery dates are reported as the yard states them, and again when they move. Where a design loses capability between contract and commissioning, usually launch cells or a hull-mounted sonar, that is worth saying plainly.

Bungled Navy Warship Referred to Anti-Corruption Watchdog

Bungled Navy Warship Referred to Anti-Corruption Watchdog

Australia’s $45 billion Hunter-class frigate program faces fresh scrutiny after Senator David Shoebridge asked the National Anti-Corruption Commission (NACC) to examine how the Royal Australian Navy chose the British Type 26 design despite warnings it carried “extreme risk.” The referral follows a
September 5, 2023

Related Coverage

Platforms & Systems is the parent section. The yards, dry docks and supplier base that set delivery dates are in Defense Infrastructure & Manufacturing. Contracts & Deals carries the individual shipbuilding awards and their option structures.

Missiles, air defense and combat systems fitted to these ships are in Weapons & Technologies, with radar and sonar in Surveillance & Reconnaissance. Asia-Pacific is where fleet expansion is fastest, and Europe & NATO where it is being reconstructed. Reports & Analysis covers the shipbuilding audits.